Zoning/Locational Clearance Issuance (Quarry)

February 08, 2024

Requirements

1 . 1. Notarized Filled Up Locational Clearance (LC) Application Form

WHERE TO SECURE:  Office of the MPDC 

2 . 2. Proof of Land Ownership (1 photo copy of any of the following)

CHECKLIST REQUIREMENT                                                                    WHERE TO SECURE:

 | ⮚       Land Title                                                                                             Registry of Deeds / Applicant 
 | ⮚       Tax Declaration                                                                                   Municipal Assessor’s Office / Applicant 
 | ⮚        Deed of Sale in the name of   the applicant                                   Applicant 
 | ⮚        Contract of Lease                                                                              Applicant 
 | ⮚         Deed of Donation                                                                              Applicant 
 | ⮚        Consent from the owner (if the applicant is not the owner)         Applicant 

3 . 3. Vicinity Map or sketch plan of the mining area

WHERE TO SECURE: Geodetic Engineer/Applicant 

4 . 4. Topographic survey

WHERE TO SECURE: Geodetic Engineer/Applicant 

5 . 5. Affidavit of no objection from residents within 500 meters perimeter of the projects site

WHERE TO SECURE:  Owner/Applicant 

6 . 6. Estimated Project Cost

WHERE TO SECURE:   Applicant 

7 . 7. Environmental Compliance Certificate ( for Environmental Critical Projects)

WHERE TO SECURE:  Environment Management Bureau-Department of Environment and Natural Resources (EMB-DENR) 

8 . 8. Clearance from owners of the existing structures within 200 m radius of the project.

WHERE TO SECURE:  Owners of the existing structures 

9 . 9. Official Receipt

WHERE TO SECURE: Municipal Treasurer’s Office 

10 . 1. Secure Locational Clearance (LC) Application Form

AGENCY ACTION: Provide Locational  Clearance Application Form and instruct the client how to fill in and give list of required documents needed. 

FEES TO BE PAID: None 

PROCESSING TIME:  5 minutes 

PERSON RESPONSIBLE:

MPDC PDO I

Adm. Assistant V

Engineering Aide I

(MPDO) 

11 . 2. Notarized the filled up LC and Submit it to the office of the MPDC with the required documents

AGENCY ACTION:  | Accept the documents and check the completeness. If not complete return to client.
 | If complete, advice the client to come back in the next day for the issuance of locational clearance.

Inspect and Geotag the site of the existing projects/ establishments/ buildings/ structures 

FEES TO BE PAID:

PROCESSING TIME:  15 minutes  / 1 day 

PERSON RESPONSIBLE:

MPDC

Engineering Aide I

(MPDO) 

Engineering Aide I

(MPDO) 

12 . 3. Clients come back to MPDO in the next day as per advice

AGENCY ACTION:  The office computes the processing fees and penalties and give order ofpayment. 

FEES TO BE PAID:

1.            Below P100,000.00 = PhP1,440.00 

2.            Over P100,000.00 – P500,000.00 = PhP2,160.00 

3.            Over P500,000.00 – 1 Million = PhP2,880.00 

4.            Over P1 Million – P2 Million = P4,320.00

5. Over P2 Million = P7,200.00 + (1/10 of 1% of cost in excess of P2.M)

*   Penalties based on Revised tax code and depends on the category of the structure

*1 Documentary stamp not included c/o MTO 

PROCESSING TIME:  10 minutes 

PERSON RESPONSIBLE:

Engineering Aide I

(MPDO) 

13 . 4. Clients will go to the Treasurer’s Office to pay then return to MPDC office to present the Official Receipt

AGENCY ACTION:  The office checks the receipt and log booked. Return the receipt to the applicant. 

FEES TO BE PAID:

PROCESSING TIME:  10 minutes 

PERSON RESPONSIBLE:

Engineering Aide I

(MPDO) 

14 . 5. Received the Locational Clearance

AGENCY ACTION:  Process LC and issue the Locational Clearance Certificate to client 

FEES TO BE PAID:

PROCESSING TIME:  10 minutes 

PERSON RESPONSIBLE:

MPDC

Engineering Aide I

(MPDO) 

Procedures